2021/01/18

MuH: Installing aircon, and sink on MuH


We are pushing now to fully complete this project. We have completed installing walls, windows, roof,

ventilation fan and air conditioning


And even the sink

The sink is quite low but usable. And you can see how it slides out of the way into the expandable shelf when not in use.

We are currently weather sealing all the joints and then we will remount the upper expansion section over the lower. We still have the rear door and expansion walls to install, at which point the "shell" will be complete.

Then on to interior and plumbing.


(If you are creative, you can do it with only the pictures you have posted above)

 